Diyarbekir Oilfield

PACKAGE : Installation & Commissioning of Offshore Pipeline and Associated Civil Works
YEAR : 2013-2014
SCOPE OF WORK : Door to Door transportation of equipment and materials from various country of origin to Kiyanly site, Turkmenistan. Two Air-Charters of AN124 was arranged for some of the urgent equipment from Singapore to Turkmenbashi airport.

Saturation-3 Diving System. Dimension: L 14.20 m x W 5.06 m x H 5.63 m (95.00 M/T)

Our client, an offshore service provider secured the installation & commissioning of offshore pipeline portion of the Diyarbekir Oilfiled Development Project and subsequently appointed CNC Freight Services to be responsible for freight and logistics arrangements of their diving equipment.

Part charter of River Vessel

Lifting of A- Frame cargo

The project included the part charter of a geared conventional vessel to transport three different consignments, comprising diving equipment, pedestal crane and pressure vessels from Pasir Gudang, Johor to Derince.

Due to the height of the Saturation 3 Diving System, on-carriage delivery to Turkmenistan was arranged via the Volga-Don Canal.

RORO service was also utilized to transport another piece of pressure vessel. With its shorter transit time, the piece arrived Derince in time to be loaded together with the first lot of cargo on the same river vessel to Turkmenbashy

On a separate occasion, the launching and mooring winches were needed urgently at site thus two Antonov 124 was chartered from Singapore to Turkmenbashy.

External crane was used to load cargo onto low-bed trailers for immediate delivery to Kianly Jobsite