Mumbai Monorail Project

PACKAGE : Rolling Stock (RST) 9 , 10 & 11
YEAR : 2013 - ongoing
SCOPE OF WORK : Delivery ex Door to Port
TOTAL SHIPPING VOLUME : 18 x 40 FR , 6 x 40 OT & 6 x 40 GP

The Mumbai Monorail project was implemented by the Mumbai Metropolitan Region Development Authority along with a consortium of Mumbai based conglomerate Larsen & Toubro and the Malaysia infrastructure firm Scomi Engineering Bhd. CNC Freight collaborated with our Mumbai agent for the delivery of 3 sets of Monorail Cars to Mumbai. Our scope involved packing works, container stuffing and direct delivery from shipper’s factory up to container vessel.

India’s first Monorail System in Mumbai began operation on the 2nd of February 2014

Due to the monorail car height of 4.80m, arrangements were made to stuff the cargo within port premises. Two custom made spreader bars form shipper were used fr tandem lifting to ensure lift stability and no damage to the car bodies. Close co-ordination was required with port authorities as direct delivery was involved.

Cargo Survey was carried out prior packing works

Stuffing monorail car on 40 FR

Quay crane lifting flat rack onto vessel