Part Charter from Mobile to Port Klang
Last December 2017, we secured a contract to transport 21 packages of regenerator components and equipment from USA to Malaysia. The charter was arranged with BBC Chartering on a last-in, first-out basis. The sea voyage took 39 days to complete.
Cargo : | Regenerator Equipment and Componets |
Total Package : | 21 packages / 3,692 cbm / 499 metric tons |
SCOPE OF WORK : | Vessel Chartering |

Barge alongside vessel for overside loading

Loading into vessel's hold at Mobile,USA

Primary cyclones on SOC Flat Rack's

Discharging of Regenerator dome head at Port Klang